Air Control Projects

In Progress

Summerset Oakleigh

Builder: APM Group
Value: $2M
Duration: 12 months

Daikin VRV-HR Ducted & Multi-Port Wall Split Systems, Building Management & Energy Monitoring Systems, Commercial Kitchen Ventilation with DX Coils, General Ventilation

Fabbrica Fitzroy

Builder: Pace Building Group
Value: $2.3M
Duration: 12 Months

3D BIM Modelling & Lead Design, Daikin VRV-HP Bulkhead Systems, Carpark Ventilation System, Tenancy Commercial Kitchen Provisions, Substation/Fire Pump Room Systems, General Ventilation Systems

Dux Churchill, Ringwood

Builder: Maben
Value: $1.5M
Duration: 12 months

Daikin VRV-HP Bulkhead (Apartment) & Ducted (Tenancy) Systems, Tenancy Ventilation Systems, Substation/Fire Pump Room Systems, Carpark & General Ventilation Systems

240 Chapel Street, Prahran

Builder: Banco Group
Value: $4.3M
Duration: 12 months

Daikin VRV-HR Ducted Systems, Commercial Tenancy Kitchen Exhausts, Heritage Building Refurbishment, Building Management System, Carpark Exhaust, Substation/Fire Pump Room Systems, Centralised General Ventilation Systems

Central Park

Builder: Figurehead
Value: $870K

Duration: 12 Months

Daikin VRV-HP Bulkhead Systems, Carpark Ventilation System, Fire Pump Room Systems, General Ventilation Systems.

Recently Completed

Projects

Pace of Sunshine

Builder: Pace Building Group
Value: $700K
Duration: 6 months

Daikin Standalone Wall Split Systems, Carpark Ventilation System, General Ventilation Systems

Federation Estate

Builder: Maroondah City Council
Value: $470K
Duration: 6 months

Decommission & Demolish Existing Ducted Systems, Retain Existing Ductwork & Supply New Actron Ducted Systems/Duct Connections, Economy Cycle Ventilation

Salesian College

Builder: Newpol
Value: $700K
Duration: 12 months

Daikin VRV-HR Ducted Systems, Science Room Fume/Chemical Cupboards, Commercial Kitchen Ventilation, General Ventilation

Pace of Coburg

Builder: Pace Building Group
Value: $700K
Duration: <12 months

A complete mechanical services package supporting 312 apartments, featuring Mitsubishi wall splits, Armcor Energy Recovery Pool Ventilation, and integrated carpark and fire pump room ventilation.

Linacre Rise

Builder: Balmain & Co
Duration: 9 months

Mechanical services delivery featuring Mitsubishi VRF‑Heat Pump bulkhead systems and Armcor ERV units for cold‑shell office tenancies, along with complete carpark and apartment ventilation systems.

Porsche Headquarters

Builder: Minicon
Program: Fast‑tracked, staged delivery

A staged mechanical upgrade across Porsche’s flagship HQ and showroom. Works included system relocations, new VRF‑Heat Recovery systems, reinstated roof‑mounted package units, next‑generation central controllers, and an upgraded Mechanical Services Switch Board.

Ilim College Kiewa Campus

Builder: Newpol Construction
Duration: 9 months

A comprehensive mechanical upgrade integrating Mitsubishi VRF‑Heat Recovery systems, Actron packaged units, BMS & energy monitoring, commercial kitchen ventilation, and general ventilation across key learning spaces including theatres, gyms, and prayer rooms.

Altona City Theatre

Builder: Hobson Bay City Council
Duration: 3 months

A rapid mechanical services upgrade replacing ageing systems with new Mitsubishi VRV‑Heat Recovery ducted units and updated Temperzone commercial‑capacity equipment. Included safe demolition of out dated roof top package units and ducted split systems and installation of a new BMS.

Morris Moor

Value: $1.6M
Duration: 12 months

HVAC installation for the 1st stage of Morris Moor- Office space, Childcare, Retail, Hospitality, Car Park.

  • Installation of Air Handling Systems, VRV systems, Building ventilation & BMS.

Creative Cubes Collingwood

Value: $1.4M
Duration: 10 months

HVAC installation over 4 floors- Share office space.

  • Installation of VRV systems
  • Installation of Car Park ventilation

Pullman on the Park

Value: $600K
Duration: 4 months

Upgrade the Mechanical systems serving the game day bar on ground floor and Level 11

  • Replacement of x4 GJ Walker Air handling systems (3 in level 21 plant room, 1 in basement)
  • Installation consisted of building air handling units in situ on level 21
  • Upgrade of building management system to improve building energy consumption

RACV Eagle House

Value: $170K Each
Duration: 2 months a floor

  • Carried out x2 level HVAC upgrades on Level 5 & Level 10
  • BMS Upgrade
  • Duct work alterations
  • Installation of supplementary water sourced systems

RSEA Park- Stage 2B & 2C

Value: $1.4M
Duration: Over 2 stages- 24 months

  • Air conditioning serving multi-purpose use facility’s for the St Kilda Football Club
  • Installation of Central Plant System
  • Installation of Mitsubishi VRF system

Aitken College

Value: $1M
Duration: 10 months

  • Mitsubishi VRF Systems serving new classrooms and learning areas over ground and level 1
  • Design and installation of a Controls building management system to control all HVAC

The Goods Shed Precinct Ballarat

Value: $475K

  • Installation of Daikin VRF Systems
  • Installation of Kitchen Ventilation

Silcock pavilion

Value: $120K
Duration: 6 months

  • Installation of 46 Mitsubishi standalone systems
  • Installation of toilet exhaust ventilation
  • Installation of kitchen exhaust system including commercial kitchen range hood
  • BMS Package

Good Shepherd Lutheran College

Value: $315K

  • Installation of Mitsubishi VRF
  • Installation of Exhaust Ventilation

Palliative Care Fitout

Value: $130K
Duration: 4 months

  • Installation of Daikin VRV heat pump
  • Installation of fresh air make up
  • Integration of existing Daikin equipment to new Daikin central controller

Packenham Childcare

Value: $195K

  • Installation of x10 split systems

  • Installation of building ventilation

Merrifield pavilion

Value: $120K
Duration: 6 months

  • Installation of 4 Daikin standalone systems
  • Installation of toilet exhaust ventilation
  • Installation of kitchen exhaust system including commercial kitchen range hood

Monash B36 Uplift

Value: $275K
Duration: 6 months

  • Installation of Daikin Cassette Systems
  • BMS upgrade
  • Existing duct work alterations
  • Installation of Medical Gas System

79 Gheringhap St, Geelong

Value: $550K

  • Installation of VRV multi head systems throughout the 2 storey office areas

  • Installation of building ventilation

Coburg Apartments

Value: $2.3m

  • Installation of x350 Split systems

  • Installation of Pool Pac system and building ventilation

Hamilton Marino

Rose St Quarter

  • Beautifully crafted residences in the most sought after pocket of Ivanhoe, designed by award winning architects Ewert Leaf.

Brompton

5 Threadneedle St

  • Threadneedle boasts just 17 exclusive residences across two carefully crafted buildings, surrounded by lush gardens.