Cohuna Consolidated School
Asset Owner: Victorian School Board Authority
Cost: $533,000
Duration: 2 Months
Project Description:
Heating, air conditioning and ventilation performance upgrade project for Victorian regional school based in Cohuna.
During the Summer holidays Air Control was engaged to decommission and strip out the schools some original 40 year old air conditioning plant which was failing the school in terms of thermal comfort and energy performance.
Air Control supplied and installed a number of new large 90kW multi-stage compressor split ducted AC units to a new purpose built outdoor plant area. Internally Air Control stripped apart old fan coil units from the roof plant and retrofitted new replacement fan coil units into position.
With modern technology and equipment that can now be relied upon Air Control restores energy efficiency and school comfort back into this large regional consolidated school.